FERC RIN: 1902-AD81 Publication ID: Fall 2010 
Title: Transmission Relay Loadability Reliability Standard 
Abstract: The Commission approved the Transmission Relay Loadability Reliability Standard (PRC-023-1), developed by the North American Electric Reliability Corporation (NERC). Reliability Standard PRC-023-1 requires transmission owners, generator owners, and distribution providers to set load-responsive phase protection relays according to specific criteria in order to ensure that the relays reliability detect and protect the electric network from all fault conditions, but do not limit transmission loadability or interfere with system operators' ability to protect system reliability. Pursuant to section 215(d)(5) of the Federal Power Act, the Commission directed NERC to develop modifications to the Reliability Standard to address specific concerns identified by the Commission, (Docket No. RM08-13-000). 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 USC 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  05/28/2009  74 FR 25461   
NPRM Comment Period Extended   07/21/2009  74 FR 35830   
NPRM Comment Period End  08/17/2009    
Final Rule (Order No. 733)  04/02/2010  75 FR 16914   
Order Granting Rehearing for Further Consideration  05/17/2010    
Order on Rehearing   12/00/2010    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Cynthia Pointer
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-6069