| FERC | RIN: 1902-AE00 | Publication ID: Fall 2010 |
| Title: ●Revision to Electric Reliability Organization Definition of Bulk Electric System | |
| Abstract: The Commission proposed to direct the Electric Reliability Organization (ERO) to revise its definition of the term "bulk electric system" to include all electric transmission facilities with a rating of 100 kV or above. The Commission proposed that a Regional Entity must seek ERO and Commission approval before exempting any facility rated at 100 kV or above from compliance with mandatory Reliability Standards, (Docket No. RM09-18-000). | |
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
| Major: Undetermined | Unfunded Mandates: No |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: No | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Jonathan First Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8529 Email: jonathan.first@ferc.gov Kumar Agarwal Acting Director, Division of Reliability and Engineering Services, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-8923 Email: kumar.agarwal@ferc.gov Robert Snow Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-6716 Email: robert.snow@ferc.gov |
|