FERC RIN: 1902-AE00 Publication ID: Fall 2010 
Title: ●Revision to Electric Reliability Organization Definition of Bulk Electric System 
Abstract: The Commission proposed to direct the Electric Reliability Organization (ERO) to revise its definition of the term "bulk electric system" to include all electric transmission facilities with a rating of 100 kV or above. The Commission proposed that a Regional Entity must seek ERO and Commission approval before exempting any facility rated at 100 kV or above from compliance with mandatory Reliability Standards, (Docket No. RM09-18-000). 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: Undetermined  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 USC 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  03/24/2010  75 FR 14097   
NPRM Comment Period End  05/10/2010    
Final Rule  12/00/2010    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Jonathan First
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-8529
Email: jonathan.first@ferc.gov

Kumar Agarwal
Acting Director, Division of Reliability and Engineering Services, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-8923
Email: kumar.agarwal@ferc.gov

Robert Snow
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-6716
Email: robert.snow@ferc.gov