View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

FERC RIN: 1902-AE00 Publication ID: Spring 2011 
Title: Revision to Electric Reliability Organization Definition of Bulk Electric System 
Abstract: Pursuant to section 215 of the Federal Power Act (FPA), the Commission adopts, with modifications, the proposal outlined in its March 18, 2010 Notice of Proposed Rulemaking to require the Electric Reliability Organization (ERO) to revise its definition of the term "bulk electric system." The Commission directed the ERO, through the ERO's Reliability Standards Development Process, to revise the definition to address the Commission's technical concerns and ensure that the definition encompasses all facilities necessary for operating an interconnected electric transmission network. Also, the Commission believes that the best way to accomplish these goals is to eliminate the regional discretion in the current definition, maintain a bright-line threshold, that includes all facilities operated at or above 100 kV except defined radial facilities, and establish an exemption process and criteria for excluding facilities that are not necessary for operating the interconnected transmission network. This Final Rule allows the ERO, in accordance with Order No. 693, to develop an alternative proposal for addressing the Commission's concerns with the present definition with the understanding that any such alternative must be as effective as, or more effective than, the Commission's proposed approach in addressing the identified technical and other concerns, and may not result in a reduction in reliability, (Docket No. RM09-18-000). 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 USC 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  03/24/2010  75 FR 14097   
NPRM Comment Period End  05/10/2010    
Final Rule (Order No. 743)  11/26/2010  75 FR 72910   
Order on Rehearing  12/00/2011    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Jonathan First
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-8529
Email: jonathan.first@ferc.gov

Mindi Sauter
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-6830
Email: mindi.sauter@ferc.gov

Robert Snow
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-6716
Email: robert.snow@ferc.gov

Patrick Boughan
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE,
Washington, DC 20426
Phone:202 502-8071
Email: patrick.boughan@ferc.gov