View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| FERC | RIN: 1902-AE06 | Publication ID: Fall 2010 |
| Title: ●Interpretation of Transmission Planning Reliability Standards | |
| Abstract: The Commission proposed to reject the North American Electric Reliability Corporation's (NERC's) proposed interpretation of Requirement R1.3.10 of Reliability Standard TPL-002-0 and, instead, proposed an alternative interpretation of the provision, (Docket No. RM10-6-000). | |
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
| Major: Undetermined | Unfunded Mandates: No |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: None |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Ron LeComte Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-8405 Email: ron.lecomte@ferc.gov Eugene Blick Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8803 Email: eugene.blick@ferc.gov Edward Franks Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-6311 Email: edward.franks@ferc.gov Lauren Rosenblatt Legal Information, Office of Enforcement Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-6517 Email: lauren.rosenblatt@ferc.gov |
|
An official website of the United States government



