| FERC | RIN: 1902-AE19 | Publication ID: Spring 2011 |
| Title: ●Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive | |
| Abstract: Under section 215 of the Federal Power Act, the Commission proposed to approve four revised regional Reliability Standards developed by the Western Electricity Coordinating Council (WECC) and approved by the North American Electric Reliability Corporation (NERC), which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. These regional Reliability Standards have been designated by WECC as FAC-501-WECC-1-Transmission Maintenance, PRC-004-WECC-1-Protection System and Remedial Action Scheme Misoperation, VAR-002-WECC-1-Automatic Voltage Regulators, and VAR-501-WECC-1-Power System Stabilizer. Proposed FAC-501-WECC-1 addresses transmission maintenance for specified transmission paths in the Western Interconnection. Proposed PRC-004-WECC-1 addresses the analysis of misoperations that occur on transmission and generation protection systems and remedial action schemes in the Western Interconnection. Proposed VAR-002-WECC-1 is meant to ensure that automatic voltage regulators remain in service on synchronous generators and condensers in the Western Interconnection. Proposed VAR-501-WECC-1 is meant to ensure that power system stabilizers remain in service on synchronous generators in the Western Interconnection. In addition, under section 215(d)(5) of the Federal Power Act, the Commission proposed to direct WECC, working through its standards development process, to develop modifications to these to regional Reliability Standards to address specific issues, (RM09-09-000). | |
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
| Major: No | Unfunded Mandates: Undetermined |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: No | Federalism: No |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Cory Lankford Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-6711 Email: cory.lankford@ferc.gov Nick Henery Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-8636 Email: nick.henery@ferc.gov Danny Johnson Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-8892 Email: danny.johnson@ferc.gov Scott Sells Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-6664 Email: scott.sells@ferc.gov |
|