View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| FERC | RIN: 1902-AE23 | Publication ID: Spring 2011 |
| Title: ●Electric Reliability Organization Interpretations of Interconnection Reliability Operations and Coordination and Transmission Operations Reliability Standards | |
| Abstract: Under section 215 of the Federal Power Act (FPA), the Commission (Commission) proposed to approve the North American Electric Reliability Corporation's (NERC) proposed interpretation of certain specific requirements of the Commission-approved Reliability Standards, TOP-005-1, Operational Reliability Information, and IRO-005-1, Reliability Coordination Current-Day Operations. Specifically, the interpretation addressed whether a Special Protection System (or SPS) that is operating with only one communication channel in service is "degraded" under these standards. The Commission proposed to approve the interpretation as being consistent with and not expanding or changing the existing Reliability Standards. However, to address Commission concerns that the interpretation fails to specify that a Special Protection System that has lost a communication channel be reported, the Commission also proposed to direct NERC pursuant to section 215 (d)(5) of the FPA to develop modifications to the TOP-005-1 and IRO-005-1 Reliability Standards, through its Reliability Standards development process. The Commission sought comments on its proposal, (RM10-8-000). | |
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: No | Federalism: No |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Richard Wartchow Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8744 Email: richard.wartchow@ferc.gov Danny Johnson Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street, NE, Washington, DC 20426 Phone:202 502-8892 Email: danny.johnson@ferc.gov |
|
An official website of the United States government



