View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| FERC | RIN: 1902-AE78 | Publication ID: Fall 2014 |
| Title: Generator Verification Reliability Standards | |
|
Abstract:
Pursuant to section 215 of the Federal Power Act, the Commission approved the following Reliability Standards that were submitted to the Commission for approval by the North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization: MOD–025–2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability), MOD–026–1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions), MOD–027–1(Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions), PRC–019–1 (Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection), and PRC–024–1 (Generator Frequency and Voltage Protective Relay Settings). The generator verification Reliability Standards help ensure that verified data is available for power system planning and operational studies by requiring the verification of generator equipment and capability needed to support Bulk-Power System reliability and promoting the coordination of important protection system settings (Docket No. RM13-16-000). |
|
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Completed Actions |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
|||||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Federalism: No | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Mark Bennett Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8524 Email: mark.bennett@ferc.gov Syed Ahmad Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8718 Email: syed.ahmad@ferc.gov |
|
An official website of the United States government




