| FERC | RIN: 1902-AE80 | Publication ID: Fall 2014 |
| Title: Reliability Standard for Geomagnetic Disturbance Operations | |
|
Abstract:
Pursuant to section 215 of the Federal Power Act, the Commission approved Reliability Standard EOP–010–1 (Geomagnetic Disturbance Operations). The North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization, submitted the Reliability Standard for Commission approval in response to a Commission directive in Order No. 779. Reliability Standard EOP–010–1 is designed to mitigate the effects of geomagnetic disturbances on the Bulk-Power System by requiring responsible entities to implement Operating Plans and Operating Procedures or Processes (Docket No. RM14-1-000). |
|
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Long-Term Actions |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
|||||||||||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Federalism: No | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Matthew Vlissides Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-8408 Email: matthew.vlissides@ferc.gov Michael Gandolfo Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-6817 Email: michael.gandolfo@ferc.gov |
|