| FERC | RIN: 1902-AE81 | Publication ID: Fall 2014 |
| Title: ●Generator Relay Loadability and Revised Transmission Relay Loadability Reliability Standards | |
|
Abstract:
Pursuant to the section regarding Electric Reliability of the Federal Power Act, the Commission approved a new Reliability Standard, PRC–025–1 (Generator Relay Loadability), submitted by the North American Electric Reliability Corporation (NERC), the Commission approved Electric Reliability Organization. In addition, the Commission approved Reliability Standard PRC–023–3 (Transmission Relay Loadability), also submitted by NERC, which revised a currently effective standard pertaining to transmission relay loadability (Docket Nos. RM13-19-000 and RM14-3-000). |
|
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Completed Actions |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 18 CFR 40 | |
| Legal Authority: 16 USC 824o | |
|
Legal Deadline:
None |
|||||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Federalism: No | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Julie Greenisen Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-6362 Email: julie.greenisen@ferc.gov Syed Ahmad Technical Information, Office of Electric Reliability Federal Energy Regulatory Commission 888 First Street NE, Washington, DC 20426 Phone:202 502-8718 Email: syed.ahmad@ferc.gov |
|