View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

FERC RIN: 1902-AE90 Publication ID: Fall 2014 
Title: ●Format and Dimensions of Maps and Drawings Required by the Commission's Hydropower Program 
Abstract:

The Commission issued this Final Rule to make minor changes to its regulations. This Final Rule amended requirements pertaining to the format and dimensions of maps and drawings submitted to the Commission by applicants and licensees in the Commission's hydropower program. Specifically, the amendments removed the requirement that applicants and licensees submit copies of certain project maps and drawings in microfilm format on aperture cards and changed the minimum and maximum dimensions applicable to submitted maps and drawings. These amendments modernize the regulations to reflect technological advances and relieve burdens placed on applicants and licensees (Docket No. RM14-20-000).

 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Completed Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 4   
Legal Authority: 16 USC 791a to 825v    16 USC 2601 to 2645    42 USC 7101 to 7352   
Legal Deadline:  None
Timetable:
Action Date FR Cite
Final Rule, Order No. 798  07/24/2014  79 FR 42973   
Final Rule Effective  09/08/2014 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Mr. Charles Kirk Cover
Technical Information, Office of Energy Projects
Federal Energy Regulatory Commission
888 First Street, N.E.,
Washington, DC 20426
Phone:202 502-8832
Email: charles.cover@ferc.gov