Title: ●Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards  
Abstract:

The Commission proposed to approve revisions to the Transmission Operations and Interconnection Reliability Operations and Coordination Reliability Standards, developed by the North American Electric Reliability Corporation, which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards (Docket No. RM15-16-000).

 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Long-Term Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 U.S.C. 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  06/24/2015  80 FR 36280   
NPRM Comment Period End  08/24/2015 
Next Action Undetermined  To Be Determined 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Robert Stroh
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-8473
Email: robert.stroh@ferc.gov

Eugene Blick
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-8803
Email: eugene.blick@ferc.gov

Darrell Piatt
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street, NE.,
Washington, DC 20426
Phone:202 502-6687
Email: darrell.piatt@ferc.gov