| FERC | RIN: 1902-AF15 | Publication ID: Fall 2016 |
| Title: Reactive Power Requirements for Non-Synchronous Generation | |
|
Abstract:
The Commission eliminated the exemptions for wind generators from the requirement to provide reactive power by revising the pro forma Large Generator Interconnection Agreement (LGIA), Appendix G to the pro forma LGIA, and the pro forma Small Generator Interconnection Agreement (SGIA). As a result, all newly interconnecting non-synchronous generators will be required to provide reactive power at the highside of the generator substation as a condition of interconnection as set forth in their LGIA or SGIA as of the effective date of the Final Rule (Docket No. RM16-1-000). |
|
| Agency: Federal Energy Regulatory Commission(FERC) | Priority: Substantive, Nonsignificant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Long-Term Actions |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 18 CFR 35 | |
| Legal Authority: 16 U.S.C. 791a to 825r 16 U.S.C. 2601 to 2645 31 U.S.C. 9701 42 U.S.C. 7101 to 7352 | |
|
Legal Deadline:
None |
|||||||||||||||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Gretchen Kershaw Legal Information, Office of the General Counsel Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-8213 Email: gretchen.kershaw@ferc.gov Brian Bak Technical Information, Office of Energy Policy and Innovation Federal Energy Regulatory Commission 888 First Street NE., Washington, DC 20426 Phone:202 502-6574 Email: brian.bak@ferc.gov |
|