DOE/EE RIN: 1904-AE43 Publication ID: Fall 2022 
Title: Test Procedures for Variable Refrigerant Flow Multi-Split Air Conditioners and Heat Pumps 
Abstract:

Consistent with the requirements under the Energy Policy and Conservation Act (EPCA), as amended, the U.S. Department of Energy (DOE) has amended the current test procedures for variable refrigerant flow (VRF) multi-split air conditioners and heat pumps (VRF multi-split systems), which are categories of commercial package air conditioning and heating equipment found at 10 CFR 431.96. DOE amended the test procedure to incorporate by reference the lasted version of the applicable industry standard. The final rule also adopted the integrated energy efficiency ratio metric in its test procedure for VRF multi- systems. Additionally, this final rule adopted provisions in the updated industry test procedure relevant to certification and enforcement, including a controls verification procedure. Now completed, this rulemaking fulfills DOE’s statutory obligation to either propose amended test procedures for this equipment or determine that the existing test procedures do not need to be amended.

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Completed Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 431   
Legal Authority: 42 U.S.C. 6314(a)(4)(B)    42 U.S.C. 6314(a)(1)(A)   
Legal Deadline:
Action Source Description Date
Other  Statutory  Subject to ASHRAE trigger for certain equipment under 42 U.S.C. 6314(a)(4)(B)   
Other  Statutory  Subject to 7-year-look-back for certain equipment under 42 U.S.C. 6314(a)(1)   
Timetable:
Action Date FR Cite
Request for Information (RFI)  07/25/2017  82 FR 34427   
RFI Comment Period End  08/24/2017 
NPRM  12/10/2021  86 FR 70644   
NPRM Comment Period End  02/08/2022 
Final Action  10/20/2022  87 FR 63860   
Final Action Effective  11/21/2022 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Catherine Rivest
General Engineer
Department of Energy
Energy Efficiency and Renewable Energy
1000 Independence Avenue SW, Building Technologies Office, EE-5B,
Washington, DC 20585
Phone:202 586-7335
Email: catherine.rivest@ee.doe.gov