View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

EPA/SWER RIN: 2050-AG16 Publication ID: Fall 2007 
Title: Revisions to the Spill Prevention, Control, and Countermeasure (SPCC) Rule 
Abstract: EPA will propose to amend 40 CFR part 112, which includes the Spill Prevention, Control, and Countermeasure (SPCC) rule promulgated under the authority of the Clean Water Act. The proposed rule may address a variety of issues associated with the July 2002 SPCC final rule. 
Agency: Environmental Protection Agency(EPA)  Priority: Economically Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: Yes  Unfunded Mandates: No 
CFR Citation: 40 CFR 112   
Legal Authority: 33 USC 1321   
Legal Deadline:  None

Statement of Need: The proposed rule is necessary to clarify the regulatory obligations of SPCC facility owners and operators and to reduce the regulatory burden where appropriate.

Summary of the Legal Basis: 33 USC 1321 et seq.

Alternatives: EPA considered alternative options for various aspects of this proposed rule, following receipt of public comments, and through logical outgrowth of previously considered alternatives. Alternative options included (1) exempting asphalt cement containers from the requirements of the SPCC rule; (2) exempting farms of a certain storage capacity, where the exact storage capacity has not been specified; (3) providing an exemption only for residential heating oil containers located at farms; (4) providing the same relief as in the preferred option to owners and operators of qualified facilities with total oil storage capacities of 5,000 gallons or less; (5) giving the option wherein owners and operators of new production facilities would be allowed one year after the start of operations to prepare and implement an SPCC Plan; (6) allowing the facilities to choose between a flowline maintenance program with a contingency plan (as in the proposed amendments) and providing a method of secondary containment for flowlines and intra-facility gathering lines; (7) regulatory alternatives for oil production facilities that have wells that produce 10 barrels or less of crude oil per day and are known as “stripper wells.”

Anticipated Costs and Benefits: At the 7 percent discount rate, the proposed amendments to the SPCC rule are expected to yield annualized cost savings of approximately $7 million from the proposed exemption of hot-mix asphalt containers, $4 million from the proposed changes for exempting pesticide application equipment, $2 million from the proposed exemption of residential heating oil containers, $251 million from the proposed amendments to the definition of facility, $1 million from the proposed clarification to the facility diagram requirements, $48 million from the proposed revision to the loading rack definition, $24 million from the streamlined requirements for Tier 1 qualified facilities, $7 million from the proposed amendments to the security requirements, $9 million from the amendments to integrity testing requirements, $2 million for owners and operators of AFVO facilities, $25 million for owners and operators of production facilities from the six-month delay in SPCC Plan preparation and implementation, and $8 million from exemption of flow-through process vessels from sized secondary containment. Additional benefits of this rule were not quantified because the impact of the rule on human health and environment are expected to be marginal. The principal effect of the proposed amendments would be lower compliance costs for owners and operators of certain types of facilities and equipment.

Risks: In the absence of quantitative information on the change in risk related to the specific proposed amendments, EPA conducted a qualitative assessment, which suggests that the proposed amendments will not lead to a significant increase in oil discharge risk.

Timetable:
Action Date FR Cite
Notice Clarifying Certain Issues  05/25/2004  69 FR 29728   
NPRM 1 yr Compliance Extension  06/17/2004  69 FR 34014   
Final 18 months Compliance Extension  08/11/2004  69 FR 48794   
NODA re certain facilities  09/20/2004  69 FR 56184   
NODA re oil-filled and process equipment  09/20/2004  69 FR 56182   
NPRM  10/15/2007  72 FR 58377   
NPRM Comment Period End  12/14/2007    
Final Action  10/00/2008    
Additional Information: SAN No. 2634.2; Split from RIN 2050-AC62.
Regulatory Flexibility Analysis Required: No  Government Levels Affected: Federal, Local, State, Tribal 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: Yes 
RIN Information URL: www.epa.gov/oilspill/spcc.htm  
RIN Data Printed in the FR: No 
Agency Contact:
Hugo Fleischman
Environmental Protection Agency
Solid Waste and Emergency Response
5104A,
Washington, DC 20460
Phone:202 564-1968
Fax:202 564-2625
Email: fleischman.hugo@epa.gov