EPA/AR RIN: 2060-AG69 Publication ID: Fall 2000 
Title: NESHAP: Industrial, Commercial and Institutional Boilers and Process Heaters 
Abstract: The Clean Air Act, as amended in 1990, requires EPA to develop emission standards for sources of hazardous air pollutants (HAPs). Industrial boilers, institutional/commercial boilers and process heaters are among the potential source categories to be regulated under section 112 of the CAA. Emissions of HAPs will be addressed by this rulemaking for both new and existing sources. EPA promulgated an NSPS for these source categories in 1987 and 1990. The standards for the NESHAP are to be technology-based and are to require the maximum achievable control technology (MACT) as described in section 112 of the CAA. 
Agency: Environmental Protection Agency(EPA)  Priority: Economically Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: Yes  Unfunded Mandates: Private Sector 
CFR Citation: 40 CFR 63   
Legal Authority: 42 USC 7412   
Legal Deadline:
Action Source Description Date
Final  Statutory    11/15/2000 

Statement of Need: Industrial boilers, institutional/commercial boilers, and process heaters are source categories listed to be regulated under section 112 of the Clean Air Act.

Summary of the Legal Basis: Section 112 of the Clean Air Act

Alternatives: Alternatives will be explored as the proposal is developed. At this early stage, no alternatives have yet been identified.

Anticipated Costs and Benefits: It is expected that this rule will result in significant costs to the affected industry, including costs for recordkeeping and reporting. These costs will be identified as the proposal is developed.

Risks: The risks from this industry are expected to be those normally associated with combustion, such as exposure to particulate matter and sulfur oxides. These will be addressed as the proposal is developed.

Timetable:
Action Date FR Cite
NPRM  01/00/2001    
Final Action  02/00/2002    
Additional Information: SAN No. 3837
Regulatory Flexibility Analysis Required: Undetermined  Government Levels Affected: Federal, Local, State 
Small Entities Affected: Businesses  Federalism: Undetermined 
Included in the Regulatory Plan: Yes 
Agency Contact:
James Eddinger
Environmental Protection Agency
Air and Radiation
D243-01,
Research Triangle Park, NC 27711
Phone:919 541-5426
Fax:919 541-5450
Email: eddinger.jim@epa.gov

William Maxwell
Environmental Protection Agency
Air and Radiation
C439-01,
Research Triangle Park, NC 27711
Phone:919 541-5430
Fax:919 541-5450
Email: maxwell.bill@epa.gov