EPA/OAR RIN: 2060-AS98 Publication ID: Fall 2016 
Title: ●National Emission Standards for Hazardous Air Pollutants for the Portland Cement Manufacturing Industry 
Abstract:

This action involves adding two alternative monitoring methods to the existing Portland Cement final rule as short term solutions to a timing issue relative to compliance demonstrations. Calibration gases and mercury generators are just now becoming available, which are needed for compliance demonstrations relative to the hydrogen chloride (HCl) and mercury continuous monitoring requirements of the Portland Cement Industry final rule. However, they will not be widely available in time for operators that requested extensions from the previous September 9, 2015, to meet their new September 9, 2016, deadline. For this reason, we have developed a direct final rule/parallel proposal to resolve these issues. (Note that these changes affect only kilns that have inline raw mills and have elected to use a mercury continuous emissions monitoring systems rather than sorbent traps, and/or kilns that do not have HCl controls, which are required to continuously monitor for HCl.) The direct final rule includes: (1) revised quality assurance language that allows facilities an alternative approach to ensuring the validity of their mercury readings at high concentrations; (2) an additional alternative method for HCl compliance that requires a yearly stack test along with the HCl monitors performing as parametric monitors instead of direct continuous monitoring; and (3) removal of temporary provisions as part of the residual risk and technology review proposal (June 2017), as we expect the calibration gases and generators to be widely available at that point in time. The direct final rule published July 25, 2016 (81 FR 48356).

 
Agency: Environmental Protection Agency(EPA)  Priority: Substantive, Nonsignificant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Completed Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 40 CFR 63   
Legal Authority: 42 U.S.C. 7401 et seq. Clean Air Act   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  07/25/2016  81 FR 48372   
Direct Final Rule  07/25/2016  81 FR 48356   
NPRM Comment Period End  08/24/2016 
Direct Final Rule Comment Period End  08/24/2016 
Direct Final Rule Effective  09/08/2016 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: State 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Korbin Smith
Environmental Protection Agency
Office of Air and Radiation
109 T.W. Alexander Drive, Mail Code D243-04,
Research Triangle Park, NC 27711
Phone:919 541-2416
Email: smith.korbin@epa.gov

Jennifer Caparoso
Environmental Protection Agency
Office of Air and Radiation
109 T.W. Alexander Drive, Mail Code E143-01,
Research Triangle Park, NC 27711
Phone:919 541-4063
Fax:919 541-0516
Email: caparoso.jennifer@epa.gov