View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| EPA/OAR | RIN: 2060-AW84 | Publication ID: Spring 2025 |
| Title: ●Revision to “Begin Actual Construction” in the New Source Review Preconstruction Permitting Program | |
|
Abstract:
The Environmental Protection Agency (EPA) intends to revise the New Source Review preconstruction permitting program’s definition of “begin actual construction.” EPA’s proposed definition will address which physical on-site construction activities a source owner or operator may, prior to obtaining an NSR permit, lawfully undertake that would not constitute construction activities on an emissions unit that are of a permanent nature. This action is intended to provide additional flexibility for source owners or operators and permitting authorities to determine, on a case-by-case basis, what constitutes beginning actual construction of a new stationary source or major modification prior to which an NSR permit must be obtained. |
|
| Agency: Environmental Protection Agency(EPA) | Priority: Other Significant |
| RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
| Major: No | Unfunded Mandates: No |
| EO 14192 Designation: Deregulatory | |
| CFR Citation: 40 CFR 51 40 CFR 52 | |
| Legal Authority: 42 U.S.C. 7401, et seq. Clean Air Act | |
|
Legal Deadline:
None |
|||||||||
Timetable:
|
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: Federal, Local, State |
| Federalism: No | |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Andrew Kormos Environmental Protection Agency Office of Air and Radiation 109 TW Alexander Dr, RTP, NC 27709 Phone:919 541-4566 Email: kormos.andrew@epa.gov Peter Keller Environmental Protection Agency Office of Air and Radiation C504-03, RTP, NC 27709 Phone:919 541-5339 Fax:919 541-5509 Email: keller.peter@epa.gov |
|
An official website of the United States government



