NRC RIN: 3150-AD93 Publication ID: Fall 1996 
Title: Reactor Site Criteria; Including Seismic and Earthquake Engineering Criteria for Nuclear Power Plants 
Abstract: The proposed rule would amend the Commission's regulations to update the criteria used in decisions regarding power reactor siting, including geologic, seismic, and earthquake engineering considerations for future nuclear power plants. The proposed rule would allow NRC to benefit from experience gained in the application of the procedures and methods set forth in the current regulation and to incorporate the rapid advancements in the earth sciences and earthquake engineering. The proposed rule primarily consists of two separate changes, namely, the source term and dose considerations, and the seismic and earthquake engineering considerations of reactor siting. ^PThe Commission is also proposing to deny the remaining issue in a petition for rulemaking filed by Free Environment, Inc., et al. (PRM-50-20). 
Agency: Nuclear Regulatory Commission(NRC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 050    10 CFR 052    10 CFR 100   
Legal Authority: 42 USC 2201    42 USC 5841   
Timetable:
Action Date FR Cite
NPRM  10/20/1992  57 FR 47802   
NPRM Comment Period End  03/26/1993  58 FR 16377   
NPRM  10/17/1994  59 FR 52255   
Final Action  11/00/1996    
Regulatory Flexibility Analysis Required: Undetermined  Government Levels Affected: Undetermined 
Included in the Regulatory Plan: No 
Agency Contact:
Leonard Soffer
Nuclear Regulatory Commission
Office of Nuclear Regulatory Research,
Washington, DC 20555-0001
Phone:301 415-6574