| NRC | RIN: 3150-AD93 | Publication ID: Fall 1996 |
| Title: Reactor Site Criteria; Including Seismic and Earthquake Engineering Criteria for Nuclear Power Plants | |
| Abstract: The proposed rule would amend the Commission's regulations to update the criteria used in decisions regarding power reactor siting, including geologic, seismic, and earthquake engineering considerations for future nuclear power plants. The proposed rule would allow NRC to benefit from experience gained in the application of the procedures and methods set forth in the current regulation and to incorporate the rapid advancements in the earth sciences and earthquake engineering. The proposed rule primarily consists of two separate changes, namely, the source term and dose considerations, and the seismic and earthquake engineering considerations of reactor siting. ^PThe Commission is also proposing to deny the remaining issue in a petition for rulemaking filed by Free Environment, Inc., et al. (PRM-50-20). | |
| Agency: Nuclear Regulatory Commission(NRC) | Priority: Substantive, Nonsignificant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
| Major: No | Unfunded Mandates: No |
| CFR Citation: 10 CFR 050 10 CFR 052 10 CFR 100 | |
| Legal Authority: 42 USC 2201 42 USC 5841 | |
Timetable:
|
| Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: Undetermined |
| Included in the Regulatory Plan: No | |
|
Agency Contact: Leonard Soffer Nuclear Regulatory Commission Office of Nuclear Regulatory Research, Washington, DC 20555-0001 Phone:301 415-6574 |
|