View Rule
| View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
| NRC | RIN: 3150-AG98 | Publication ID: Spring 2018 |
| Title: Modifications to Pressure-Temperature Limits [NRC-2008-0582] | |
|
Abstract:
This rule would amend the Commission's regulations to eliminate those requirements for pressure-temperature limits that are related to the metal temperature of the reactor pressure vessel closure head flange and vessel flange areas. The proposed rule would amend footnotes 2 and 6 to table 1 of appendix G, and simplify the structure of the table. This rulemaking would address a petition for rulemaking submitted by Westinghouse Electric Company (PRM-50-69) on November 4, 1999. |
|
| Agency: Nuclear Regulatory Commission(NRC) | Priority: Substantive, Nonsignificant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Prerule Stage |
| Major: No | Unfunded Mandates: No |
| EO 14192 Designation: Independent agency | |
| CFR Citation: 10 CFR 50 10 CFR 52 | |
| Legal Authority: 42 U.S.C. 2201 42 U.S.C. 5841 | |
|
Legal Deadline:
None |
||||||||||||
Timetable:
|
| Additional Information: This activity has been identified for discontinuation per Commission direction (SRM-SECY-15-0105). This rule was formerly titled "Revision to Reactor Vessel Material Surveillance Program Requirements" and was retitled to focus on changes to appendix G. | |
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: No | Federalism: No |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Stewart Schneider Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards, Washington, DC 20555-0001 Phone:301 415-4123 Email: stewart.schneider@nrc.gov |
|
An official website of the United States government




