Title: Performance-Based Emergency Core Cooling System Acceptance Criteria [NRC-2008-0332]  
Abstract:

The NRC staff is developing a proposed rule to amend the Commission's regulations to revise the acceptance criteria for the emergency core cooling system (ECCS) for light-water nuclear power reactors. The proposed ECCS acceptance criteria would be performance-based, and reflect recent research findings which identified new embrittlement mechanisms for fuel rods with zirconium alloy cladding under loss-of-coolant accident conditions. The proposed rule would also address two petitions for rulemaking by establishing requirements applicable to all fuel types and cladding materials, and requiring the consideration of crud, oxide deposits, and hydrogen content in zirconium-based alloy fuel cladding. Further, the proposed rule would contain a provision allowing entities to use a risk-informed alternative to address the effects of debris during the long-term period.

 
Agency: Nuclear Regulatory Commission(NRC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Long-Term Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 50   
Legal Authority: 42 USC 2201    42 USC 5841   
Legal Deadline:  None
Timetable:
Action Date FR Cite
ANPRM  08/13/2009  74 FR 40765   
ANPRM Comment Period End  10/27/2009    
NPRM  03/24/2014  79 FR 16106   
NPRM Comment Period End  06/09/2014 
Final Rule  06/00/2017 
Additional Information: The NRC staff provided the proposed rule package (SECY-12-0034, Proposed Rulemaking 10 CFR 50.46c: Emergency Core Cooling System Performance During Loss-of-Coolant Accidents (RIN 3150-AH42)) to the Commission on March 1, 2012. The package is publicly available at ADAMS Accession No. ML112620346. That package was supplemented by a memo to the Commission dated June 1, 2012 (ADAMS Accession No. ML12137A852). The staff requirements memorandum was issued on January 7, 2013, and is available at ADAMS Accession No. ML13007A478. The proposed rule will be published following Commission review of the revised proposed rule package that incorporates the Commission direction in SRM-SECY-12-0034. Per COMSECY-13-0006, "10 CFR 50.46c Rulemaking: Request to Defer Draft Guidance and Extension Request for Final Rule and Final Guidance" (ADAMS Accession No. ML13129A401), the final 10 CFR 50.46c rule is due to the Commission on February 28, 2016.
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Alysia Bone
Nuclear Regulatory Commission
Office of Nuclear Material Safety and Safeguards,
Washington, DC 20555-0001
Phone:301 415-1034
Email: alysia.bone@nrc.gov