View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

NRC RIN: 3150-AJ30 Publication ID: Fall 2014 
Title: List of Approved Spent Fuel Storage Casks: Transnuclear, Inc., NUHOMS® HD Cask System, Amendment 2 [NRC-2013-0269] 
Abstract:

The direct final rule amends the Commission's regulations by revising the Transnuclear, Inc., NUHOMS® HD Cask System listing within the "List of Approved Spent Fuel Storage Casks" to include Amendment No. 2 to Certificate of Compliance No. 1030. The direct final rule allows holders of power reactor operating licensees to store spent fuel in this approved cask system under a general license. Amendment 2 would revise authorized contents to increase the soluble boron concentration to 2,800 ppm for criticality safety analyses and add maximum enrichments for Combustion Engineering 14x14 fuel assemblies that were previously unauthorized for storage; improve clarity of certain technical specifications, such as heat load zoning configuration fuel qualification table fuel class and intact fuel/damaged fuel definitions; allow for increased fuel assembly weight by 25 pounds; revise the definition of control components; include blended low enriched uranium fuel material; increase shielding effectiveness of the horizontal storage module by adding optional dose reduction hardware; update licensing basis documents based on recent experience with ongoing licensing actions involving other NUHOMS® systems; and accommodate installation practices for a limiting gap size that was evaluated based on dose rates. In addition, the amendment makes editorial changes to the technical specifications.

 
Agency: Nuclear Regulatory Commission(NRC)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Completed Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 72   
Legal Authority: 42 USC 2201    42 USC 5841   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  07/31/2014  79 FR 44318   
Direct Final Rule  07/31/2014  79 FR 44264   
NPRM Comment Period End  09/02/2014 
Confirmation of Effective Date  09/30/2014  79 FR 58672   
Direct Final Rule Effective  10/14/2014 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Gregory Trussell
Nuclear Regulatory Commission
Office of Federal and State Materials and Environmental Management Programs,
Washington, DC 20555-0001
Phone:301 415-6445
Email: gregory.trussell@nrc.gov