| NRC | RIN: 3150-AJ67 | Publication ID: Spring 2018 |
| Title: Advanced Power Reactor (APR)-1400 (KEPCO/KHNP) Design Certification [NRC-2015-0224] | |
|
Abstract:
This rule would amend the Nuclear Regulatory Commission's regulations in 10 CFR part 52 by issuing a new appendix for the initial certification of the APR-1400 standard plant design (Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd). Applicants intending to construct and operate a nuclear power plant using the APR-1400 design may do so by referencing this design certification rule. Note that the final safety evaluation report serves as the regulatory basis for this rule. |
|
| Agency: Nuclear Regulatory Commission(NRC) | Priority: Other Significant |
| RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Prerule Stage |
| Major: No | Unfunded Mandates: No |
| EO 14192 Designation: Independent agency | |
| CFR Citation: 10 CFR 52 | |
| Legal Authority: 42 U.S.C. 2201 42 U.S.C. 5841 | |
|
Legal Deadline:
None |
||||||||||||
Timetable:
|
| Additional Information: The NRC staff is developing the regulatory basis. | |
| Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
| Small Entities Affected: No | Federalism: No |
| Included in the Regulatory Plan: No | |
| RIN Data Printed in the FR: No | |
|
Agency Contact: Robert Beall Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards, Washington, DC 20555-0001 Phone:301 415-3874 Email: robert.beall@nrc.gov |
|