View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

EPA/AR RIN: 2060-AQ68 Publication ID: Spring 2011 
Title: ●Residual Risk and Technology Review for Secondary Lead Smelters NESHAP 
Abstract: This action is the Risk and Technology Review (RTR) for Secondary Lead Smelters. It will address both EPA's obligation under Clean Air Act (CAA) section 112(f)(2) and 112(d)(6) to conduct a residual risk review and to conduct a technology review. Under the "technology review" provision of CAA section 112, EPA is required to review maximum achievable control technology (MACT) standards and to revise them "as necessary (taking into account developments in practices, processes and control technologies)" no less frequently than every 8 years. Under the "residual risk" provision of CAA section 112, EPA must evaluate the MACT standards within 8 years after promulgation and promulgate standards if required to provide an ample margin of safety to protect public health or prevent an adverse environmental effect. The MACT standards for Secondary Lead Smelters, which are also known as the National Emissions Standards for Hazardous Air Pollutants (NESHAP) for Secondary Lead Smelters, were promulgated on June 23, 1995 under Clean Air Act Section 112(d). The standards establish emission limitations and work practice standards for all new and existing secondary lead smelters that produce refined lead from lead scrap, mainly recycled spent lead acid batteries. The RTRs for secondary lead smelters will be conducted in this rulemaking. These reviews will address possible residual risks, technology advancements, and technical deficiencies in the existing NESHAP. 
Agency: Environmental Protection Agency(EPA)  Priority: Other Significant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: Not Yet Determined     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: Not Yet Determined   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  06/00/2011    
Final Action  12/00/2011    
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Chuck French
Environmental Protection Agency
Air and Radiation
109 T.W. Alexander Drive, Mail Code D243-02,
Research Triangle Park, NC 27711
Phone:919 541-7912
Fax:919 541-4991
Email: french.chuck@epa.gov

Nick Hutson
Environmental Protection Agency
Air and Radiation
109 T.W. Alexander Drive, Mail Code D243-01,
Research Triangle Park, NC 27711
Phone:919 541-2968
Fax:919 541-4991
Email: hutson.nick@epa.gov