View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOI/BSEE | RIN: 1014-AA11 | Publication ID: Spring 2015 |
Title: Blowout Prevention Systems and Well Control | |
Abstract:
This proposed rule would upgrade regulations related to the design, manufacture, and repair of blowout preventers (BOPs) in response to numerous recommendations. In addition to BOPs, the proposed rule will address well design, well control, safe drilling margins, casing, cementing, real-time monitoring, and subsea containment. The proposed rule will address many of the issues raised following the Deepwater Horizon incident and from experts through a public forum held May 22, 2012. |
|
Agency: Department of the Interior(DOI) | Priority: Economically Significant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: Yes | Unfunded Mandates: No |
CFR Citation: 30 CFR 250 | |
Legal Authority: 30 U.S.C. 1751 31 U.S.C. 9701 43 U.S.C. 1334 |
Legal Deadline:
None |
||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Yes | Government Levels Affected: None |
Small Entities Affected: Businesses | Federalism: No |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: Yes | |
Agency Contact: Lakeisha Harrison Chief, Regulations and Standards Branch Department of the Interior Bureau of Safety and Environmental Enforcement 45600 Woodland Road, Sterling, VA 20166 Phone:703 787-1552 Fax:703 787-1555 Email: lakeisha.harrison@bsee.gov |