View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

FERC RIN: 1902-AE62 Publication ID: Spring 2015 
Title: Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations 
Abstract:

On rehearing, the Commission reaffirmed its basic determinations in Order No. 790 and modified and clarified certain aspects of the Final Rule. Order No. 790 amended the Commission’s regulations to clarify that auxiliary installations added to existing or proposed interstate transmission facilities under the Commission’s regulations must be located within the authorized right-of-way or site for existing facilities or the right-of-way or site to be used for facilities proposed in a pending application for case-specific certificate authority or in a prior notice filing under the Commission’s blanket certificate regulations and use only the same temporary work space that was or will be used to construct the existing or proposed facilities. Order No. 790 also codified the common industry practice of notifying landowners prior to coming onto their property to undertake projects, or certain replacements, or certain maintenance activities (Docket No. RM12-11-002).

 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Long-Term Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 2    18 CFR 157    18 CFR 380   
Legal Authority: 5 U.S.C. 601    15 U.S.C. 717 to 717z    15 U.S.C. 3301 to 3432    16 U.S.C. 792 to 828c    16 U.S.C. 2601 to 2645    42 U.S.C. 4321 to 4370h    42 U.S.C. 7101 to 7352   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  01/04/2013  78 FR 679   
Order Granting Rehearing for Further Consideration  02/20/2013 
NPRM Comment Period End  03/05/2013 
Final Rule, Order No.790  12/04/2013  78 FR 72794   
Order Granting Rehearing for Further Consideration  01/22/2014 
Final Rule Effective  02/03/2014 
Final Rule; Order on Rehearing and Clarification, Order No. 790-A  11/25/2014  79 FR 70056   
Order Granting Rehearing for Further Consideration  01/20/2015 
Final Rule Effective  01/26/2015 
Next Action Undetermined  To Be Determined 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Gordon Wagner
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street, NE.,
Washington, DC 20426
Phone:202 502-8947
Email: gordon.wagner@ferc.gov

Katherine Liberty
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street, NE.,
Washington, DC 20426
Phone:202 502-6491
Email: katherine.liberty@ferc.gov

Howard Wheeler
Technical Information, Office of Energy Projects
Federal Energy Regulatory Commission
888 First Street, NE.,
Washington, DC 20426
Phone:202 502-8688
Email: howard.wheeler@ferc.gov

Douglas Sipe
Technical Information, Office of Energy Projects
Federal Energy Regulatory Commission
888 First Street, NE.,
Washington, DC 20426
Phone:202 502-8837
Email: douglas.sipe@ferc.gov