View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOI/BLM | RIN: 1004-AE54 | Publication ID: Spring 2017 |
Title: ●Waste Prevention, Production Subject to Royalties, and Resource Conservation; Delay and Suspension of Implementation Dates for Certain Requirements | |
Abstract:
This proposed rule would temporarily suspend and delay certain requirements contained in a final rule that published in the Federal Register on November 18, 2016 (81 FR 83008). The final rule went into effect on January 17, 2017. Some of its provisions have delayed implementation dates that have not yet gone into effect. The delays and suspensions are consistent with the President's March 28, 2017, Executive Order on Promoting Energy Independence and Economic Growth and its requirement that the BLM review the previous, related final rule to determine whether revisions, rescissions, or suspensions are appropriate. The proposed rule would suspend until July 17, 2019, provisions pertaining to: waste minimization plans; flaring and venting of gas during drilling and production operations, and during well completions and related operations; determining the emissions levels of storage vessels; and minimizing gas vented during downhole well maintenance and liquids unloading. The proposed rule would delay until July 17, 2019 (or by 18 months) provisions pertaining to: gas capture; measuring and reporting gas volumes vented and flared; existing approvals to flare royalty free; replacing pneumatic controllers; and leak detection and repair. |
|
Agency: Department of the Interior(DOI) | Priority: Economically Significant |
RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: No | Unfunded Mandates: No |
CFR Citation: 43 CFR 3164.1 43 CFR subpart 3170 43 CFR subpart 3179 (To search for a specific CFR, visit the Code of Federal Regulations.) | |
Legal Authority: 25 U.S.C. 396d 25 U.S.C. 2107 30 U.S.C. 189 30 U.S.C. 306 30 U.S.C. 359 30 U.S.C. 1751 43 U.S.C. 1732(b) 43 U.S.C. 1733 43 U.S.C. 1740 |
Legal Deadline:
None |
|||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: No | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Related RINs: Related to 1004-AE53 | |
Agency Contact: Steven Wells Division Chief, Fluid Minerals Division Department of the Interior Bureau of Land Management Room 2134 LM, 20 M Street SE, Washington, DC 20003 Phone:202 912-7143 Fax:202 912-7194 Email: s1wells@blm.gov |