View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/EE RIN: 1904-AC72 Publication ID: Fall 2018 
Title: Test Procedures for Illuminated Exit Signs 
Abstract:

EPCA requires DOE to evaluate, at least once every seven years, the test procedures for all covered products and either amend the test procedures or publish a determination in the Federal Register not to amend them. EPCA also requires DOE to amend its test procedures for all covered products to include measurement of energy consumption of each product while in standby mode or off mode. This rule satisfies these requirements and includes a number of amendments to the test procedure for illuminated exit signs.

 
Agency: Department of Energy(DOE)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Long-Term Actions 
Major: No  Unfunded Mandates: No 
EO 13771 Designation: Other 
CFR Citation: 10 CFR 430.204   
Legal Authority: 42 U.S.C. 6293(b)(1)(A)    42 U.S.C. 6295(gg)(2)(A)   
Legal Deadline:
Action Source Description Date
Other  Statutory  Subject to 7-year-look-back in 6293(b)   
Timetable:
Action Date FR Cite
Next Action Undetermined  To Be Determined 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Federalism: No 
Included in the Regulatory Plan: No 
RIN Information URL: www1.eere.energy.gov/buildings/appliance_standards/product.aspx?productid=13  
RIN Data Printed in the FR: No 
Agency Contact:
Lucy DeButts
Buildings Technologies Office, EE-5B
Department of Energy
Energy Efficiency and Renewable Energy
1000 Independence Avenue SW,
Washington, DC 20585
Phone:202 287-1604
Email: lucy.debutts@ee.doe.gov