View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOD/COE RIN: 0710-AA78 Publication ID: Spring 2019 
Title: Natural Disaster Procedures: Preparedness, Response, and Recovery Activities of the Corps of Engineers 
Abstract:

The Corps is proposing to update the Federal regulation for its natural disaster procedures currently promulgated in 33 CFR part 203. This proposed rule continues the rulemaking process to revise 33 CFR part 203, which implements section 5 of the Flood Control Act of 1941, as amended, (33 U.S.C. 701n), commonly referred to as Public Law 84-99. The Corps initiated this process through advanced notice of proposed rulemaking (ANPR) on February 13, 2015. The revisions under consideration would respond to the comments to the ANPR. The revisions address statutory changes to the program enacted in section 3011 and 3029 of the Water Resources and Reform Development Act of 2014 (WRRDA 2014) regarding the System Wide Improvement Framework (SWIF), modifications to Flood Control Works (FCW) and Coastal Storm Risk Management Projects (formerly referred to as Hurricane and Shore Protection Projects); and nonstructural alternatives to rehabilitation, if requested by the non-Federal sponsor. Additional revisions address statutory changes from section 1176 of the Water Resources Development Act of 2016 (WRDA), which provided an express definition of nonstructural alternatives, as that term is used in Public Law 84-99, and authorized the Chief of Engineers, under certain circumstances, to increase the level of protection of flood control or hurricane or shore protection works when conducting repair or restoration activities to such works under Public Law 84-99. Other significant changes under consideration include revisions to the eligibility criteria for rehabilitation assistance for flood control works (FCW), an increase to the minimum repair cost for FCW projects, revised policies to address endangered species and vegetation management during rehabilitation, and a change in the cost share for emergency measures constructed using permanent construction standards.

 
Agency: Department of Defense(DOD)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: Undetermined  Unfunded Mandates: No 
EO 13771 Designation: Other 
CFR Citation: 33 CFR 203   
Legal Authority: 33 U.S.C. 701n   
Legal Deadline:  None
Timetable:
Action Date FR Cite
ANPRM  02/13/2015  80 FR 8014   
ANPRM Comment Period End  04/14/2015 
NPRM  06/00/2019 
NPRM Comment Period End  07/00/2019 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: Yes 
RIN Data Printed in the FR: No 
Agency Contact:
Willem Helms
Department of Defense
U.S. Army Corps of Engineers
CECW-HS, 441 G Street NW,
Washington, DC 20314
Phone:202 761-5909
Email: willem.h.helms@usace.army.mil