View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOE/EE | RIN: 1904-AD67 | Publication ID: Spring 2020 |
Title: Test Procedures for Fluorescent Lamp Ballasts | |
Abstract:
The U.S. Department of Energy (DOE) is required to review its test procedures for fluorescent lamp ballasts once every 7 years under the Energy Policy and Conservation Act (EPCA), as amended. In this rulemaking, DOE is reviewing its test procedures for fluorescent lamp ballasts and considering whether to update the fluorescent lamp ballasts test procedures under appendix Q to subpart B of 10 CFR part 430 or issue a determination that no amendments to the current test procedure are required. Once completed, this rulemaking will fulfill DOE’s statutory obligation to either propose amended test procedures for this product or determine that the existing test procedures do not need to be amended. |
|
Agency: Department of Energy(DOE) | Priority: Substantive, Nonsignificant |
RIN Status: Previously published in the Unified Agenda | Agenda Stage of Rulemaking: Final Rule Stage |
Major: Undetermined | Unfunded Mandates: No |
EO 13771 Designation: Other | |
CFR Citation: 10 CFR 430, App. Q to subpart B (To search for a specific CFR, visit the Code of Federal Regulations.) | |
Legal Authority: 42 U.S.C. 6293 (b)(1)(A) 42 U.S.C. 6292(a)(13) |
Legal Deadline:
|
||||||||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: None |
Federalism: No | |
Included in the Regulatory Plan: No | |
RIN Information URL: www1.eere.energy.gov/buildings/appliance_standards/standards.aspx?productid=3 | |
RIN Data Printed in the FR: No | |
Agency Contact: Lucy DeButts Buildings Technologies Office, EE-5B Department of Energy Energy Efficiency and Renewable Energy 1000 Independence Avenue SW, Washington, DC 20585 Phone:202 287-1604 Email: lucy.debutts@ee.doe.gov |