NRC RIN: 3150-AJ98 Publication ID: Fall 2021 
Title: NuScale Small Modular Reactor Design Certification [NRC-2017-0029] 
Abstract:

This rulemaking would amend the NRC's regulations to incorporate the NuScale small modular reactor (SMR) standard plant design. The rulemaking would add a new appendix for the initial certification of the NuScale SMR standard plant design. This action would allow applicants intending to construct and operate an SMR to reference this design certification rule in future applications. 

 
Agency: Nuclear Regulatory Commission(NRC)  Priority: Other Significant 
RIN Status: Previously published in the Unified Agenda Agenda Stage of Rulemaking: Final Rule Stage 
Major: No  Unfunded Mandates: No 
CFR Citation: 10 CFR 52   
Legal Authority: 42 U.S.C. 2201    42 U.S.C. 5841   
Legal Deadline:  None

Statement of Need:

This rule would place the NuScale standard design certification, once issued by the Commission, into the Code of Federal Regulations (CFR). 

Summary of the Legal Basis:

The regulations in 10 CFR 52.51 require the NRC to initiate rulemaking after an application is filed under 10 CFR 52.45.

Alternatives:

Based on a review of NuScale Power’s evaluation, the NRC concludes that: (1) NuScale Power identified a reasonably complete set of potential design alternatives to prevent and mitigate severe accidents for the NuScale design and (2) none of the potential design alternatives appropriate at the design certification stage are justified on the basis of cost/benefit considerations.

Anticipated Costs and Benefits:

There is no anticipated increase in costs for consumers, individual industries, or geographical regions as a result of the rulemaking.  This action will certify a reactor design; it does not constitute the license for construction of a nuclear power plant at a site.

Risks:

None.

Timetable:
Action Date FR Cite
NPRM  07/01/2021  86 FR 34999   
NPRM Comment Period End  08/30/2021 
NPRM Comment Period Extended  08/24/2021  86 FR 47251   
NPRM Comment Extension Period End   10/14/2021 
Final Rule  03/00/2022 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Small Entities Affected: No  Federalism: No 
Included in the Regulatory Plan: Yes 
RIN Data Printed in the FR: No 
Agency Contact:
Yanely Malave-Velez
Nuclear Regulatory Commission
Office of Nuclear Material Safety and Safeguards,
Washington, DC 20555-0001
Phone:301 415-1519
Email: yanely.malave-velez@nrc.gov