View Rule

View EO 12866 Meetings Printer-Friendly Version     Download RIN Data in XML

DOE/ENDEP RIN: 1901-AB62 Publication ID: Spring 2023 
Title: ●Coordination of Federal Authorizations for Electric Transmission Facilities  
Abstract:

This rulemaking proposes to provide an updated process for the timely submission of information needed for Federal authorizations for proposed electric transmission facilities pursuant to section 216(h) of the Federal Power Act (FPA) (16 U.S.C. 824p(h)). It seeks to ensure electric transmission projects are developed consistent with the nation’s environmental laws, including laws that protect endangered and threatened species, critical habitats, and historic properties. It provides a framework, called the Integrated Interagency Pre-Application (IIP) Process, by which the U.S. Department of Energy (DOE) will coordinate submission of materials necessary for federal authorizations and related environmental reviews required under Federal law to site qualified electric transmission facilities, and integrates that IIP Process into the Federal Electric Transmission Authorization Coordination Program.

 
Agency: Department of Energy(DOE)  Priority: Other Significant 
RIN Status: First time published in the Unified Agenda Agenda Stage of Rulemaking: Proposed Rule Stage 
Major: Undetermined  Unfunded Mandates: Undetermined 
CFR Citation: 10 CFR part 900     (To search for a specific CFR, visit the Code of Federal Regulations.)
Legal Authority: 16 U.S.C. 824p(h)   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  08/00/2023 
Regulatory Flexibility Analysis Required: Undetermined  Government Levels Affected: Undetermined 
Federalism: Undetermined 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Gabriel Daly
Department of Energy
1000 Independence Avenue SW,
Washington, DC 20585
Phone:240 597-6973
Email: gabriel.daly@hq.doe.gov