View Rule
View EO 12866 Meetings | Printer-Friendly Version Download RIN Data in XML |
DOE/ENDEP | RIN: 1901-AB62 | Publication ID: Spring 2023 |
Title: ●Coordination of Federal Authorizations for Electric Transmission Facilities | |
Abstract:
This rulemaking proposes to provide an updated process for the timely submission of information needed for Federal authorizations for proposed electric transmission facilities pursuant to section 216(h) of the Federal Power Act (FPA) (16 U.S.C. 824p(h)). It seeks to ensure electric transmission projects are developed consistent with the nation’s environmental laws, including laws that protect endangered and threatened species, critical habitats, and historic properties. It provides a framework, called the Integrated Interagency Pre-Application (IIP) Process, by which the U.S. Department of Energy (DOE) will coordinate submission of materials necessary for federal authorizations and related environmental reviews required under Federal law to site qualified electric transmission facilities, and integrates that IIP Process into the Federal Electric Transmission Authorization Coordination Program. |
|
Agency: Department of Energy(DOE) | Priority: Other Significant |
RIN Status: First time published in the Unified Agenda | Agenda Stage of Rulemaking: Proposed Rule Stage |
Major: Undetermined | Unfunded Mandates: Undetermined |
CFR Citation: 10 CFR part 900 (To search for a specific CFR, visit the Code of Federal Regulations.) | |
Legal Authority: 16 U.S.C. 824p(h) |
Legal Deadline:
None |
||||||
Timetable:
|
Regulatory Flexibility Analysis Required: Undetermined | Government Levels Affected: Undetermined |
Federalism: Undetermined | |
Included in the Regulatory Plan: No | |
RIN Data Printed in the FR: No | |
Agency Contact: Gabriel Daly Department of Energy 1000 Independence Avenue SW , Washington, DC 20585 Phone:240 597-6973 Email: gabriel.daly@hq.doe.gov |